RobsonWoese Inc provided Verizon with project team leadership
to fast track a $2.3 million dollar Design / Build project
involving the installation of a 600-ton chiller and
infrastructure to supplement an existing high-rise building
chilled water system. Services included the following:
- Complete mechanical, electrical, plumbing, structural
and architectural systems design to integrate a new
high performance chiller system with the existing chiller
system to functionally and continually serve all mission
critical equipment areas throughout Verizon's main Central
Office located in Buffalo New York.
|
|
 |
|
|
 |