Infrastructure Upgrades

RobsonWoese provides focused practical solutions
that properly manage the full data life cycle
needs of our clients.

A company's data is a key corporate asset. It pays to have an experienced partner provide expertise in data center design. RobsonWoese provides the technical insight and experience required to evaluate the cost-effectiveness, manageability, and integrity of your data center infrastructure.

Case Study

Infrastructure Upgrades

Design and Construction Administration

Confidential Client
Nation-Wide Locations

RobsonWoese has provided HVAC, fire protection, and electrical services for this confidential client's data centers nation-wide. One typical project included a detailed design evaluation report and design development documents for the renovation of a 6,000 sq. ft./10,000 sq. ft. future data center, followed by design and construction administration services for the construction and commissioning of the facility. The electrical system included dual electric services, two 1.5 MW generators, dual modular UPS systems, and redundant 2 N+1, Tier 3 power system for the data racks. Additionally, RW provided engineering design and construction administration for the renovation of an existing 67,000 sq. ft. building to house data center/headend facilities, training facilities, and offices for broadband cable operations.