RobsonWoese Inc provided Verizon with project team leadership
to fast track a $2.3 million Design / Build project
involving the installation of a 600-ton chiller and
infrastructure to supplement an existing high-rise building
chilled water system. Services included the following:
- Complete mechanical, electrical, plumbing, structural
and architectural systems strategy to integrate
a new high performance chiller system with the existing
chiller system to functionally and continually serve
all mission critical equipment areas throughout
Verizon's main Central Office located in Buffalo,
New York.
- RobsonWoese Inc was responsible for the commissioning
process and making the final recommendations to
the Owner regarding functional performance of the
commissioned new systems. The functional testing
program objectively verified that the new system
performed interactively in accordance with the Project
Documents. Written, repeatable test procedures were
prepared specifically for each system module, and
were used to functionally test components and systems
in all modes of operating conditions specified for
testing. These tests were documented to clearly
describe the individual systematic test procedures,
the expected systems response or acceptance criteria
for each procedure, and the actual response or findings.
|
|
 |
|
|
 |