About RW RW Mission RW Newsflash RW Careers Contact RW Home
RobsonWoese Inc
MORE than Engineers
 
Consulting Program Management Engineering Construction Services
Consulting
Expertise
Banking
Commissioning
Education
Energy-Sustainable Design
Fire Protection-Security
Government
Healthcare
Retail-Commercial
Telecommunications Infrastructure

RobsonWoese Inc provided Verizon with project team leadership to fast track a $2.3 million Design / Build project involving the installation of a 600-ton chiller and infrastructure to supplement an existing high-rise building chilled water system. Services included the following:
  • Complete mechanical, electrical, plumbing, structural and architectural systems strategy to integrate a new high performance chiller system with the existing chiller system to functionally and continually serve all mission critical equipment areas throughout Verizon's main Central Office located in Buffalo, New York.

  • RobsonWoese Inc was responsible for the commissioning process and making the final recommendations to the Owner regarding functional performance of the commissioned new systems. The functional testing program objectively verified that the new system performed interactively in accordance with the Project Documents. Written, repeatable test procedures were prepared specifically for each system module, and were used to functionally test components and systems in all modes of operating conditions specified for testing. These tests were documented to clearly describe the individual systematic test procedures, the expected systems response or acceptance criteria for each procedure, and the actual response or findings.

back to top
  © 2006 RobsonWoese Inc. All rights reserved.